12.5K Bus Liaison
Description / Narrative / Protocol:
Bus liaison(s) will be there to greet the buses that take 12.5K runners to their race start when they arrive (about 7:45AM), hold them back from the start of the 25K race until it has started, guide them into the Lutsen surface lot / “bus stop”, answer any driver questions and answer any runner questions. Wear a fluorescent safety vest (located in race trailer).
See THIS diagram https://www.superiorspringtrailrace.com/wp-content/uploads/Superior-Spring-Trail-Race-Bus-Staging-and-Pickup-Diagram-Map-Revised-5-7-23.jpg
See the Caribou Highlands diagram HERE https://www.superiorspringtrailrace.com/wp-content/uploads/superior-spring-trail-race-finish-area-diagram-rev-4-30-22.jpg
Narrative: Buses for the 12.5K should stage on Ski Hill Road well back from the Lutsen gravel surface-lot turn-in / not pull into the parking lot until the 25K race has started and the road has cleared. The lot is across Ski Hill Road from Caribou Highlands – 371 Ski Hill Road, Lutsen MN 55612. We start the 25K race from Caribou Highlands at 8:00AM and want all of those runners clear before we pull the buses in to pickup the 12.5K runners. 12.5K runners have been told that the busses depart at 8:15AM We hope to have the busses staged on Ski Hil Road by 8:00AM, moved in front of the Caribou Highlands Lodge by 8:10AM, loaded by 8:20AM and departing by 8:25AM. It is an approximate 10 minute drive to the 12.5K race start at Cathedral of the Pines Camp – 760 Caribou Trail, Lutsen, MN 55612. The hope is to have runners unloaded by 8:40AM for the 9:00AM race start.
A few questions runners may ask:
What time does the 12K start? 9AM
Is there water at the start? No
Are there toilets at the start? Yes
Can I send “warmups” back to the finish? Yes
Is there an aid station on the 12.5K course? No
Is there anywhere to bail out on the 12.5K course? No
12.5K Race Start
Day: Friday Start: 8:15 AM Finish: 9:45 AM
Report To: Race Director at Caribou Highlands
Description: Travel with small team to the start of the 12.5K race start on Caribou Trail. This includes the RD, one person from the timing team, the 12.5K course sweepers and an additional helper or two.
Responsibilities: Help facilitate the start of the 12.5K race which starts at 9:00AM per THIS plan https://www.superiorspringtrailrace.com/wp-content/uploads/12KM-Race-Start-Layout-Logistics-Plan-Revised-5-7-23.jpg
Aid Station - Sawbill
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#sawbill
Important: Note that the aid station open and close times listed below are projections based on current course record times – you should plan to arrive well before the listed open time to allow ample time to setup your aid station and be ready for the first runner.
Day: Saturday
Open: 8:00 AM Saturday (First expected runner approximately 8:30 AM – Arrive early for time to setup)
Close: 1:00 PM Saturday (last runner expected around 12:00 Noon – add time for cleanup and teardown)
Cutoff: 12:00 Noon Saturday
Report To: Sawbill / Britton Peak Aid Station / Aid Station Captain – Dale Immerfall
Description: The Sawbill / Britton Peak aid station is located 5.7 miles from the Oberg Mountain aid station. 50 KM runners reach the Britton Peak aid station at mile 13.3 on their outbound leg, and again at mile 17.7 on their return leg. The 50 KM turnaround is 2.2 miles from the Britton Peak aid station, at Carlton Peak. There is no aid station at the turnaround, and crew access at the tunraround on Carlton Peak is prohibited. First expected 50K runner in to this aid station around 8:30 AM. The Sawbill / Britton Peak Aid Station Cutoff is 12:00 noon (17:00 minute miles or 3.5 MPH average)
Driving Directions:
Turn off of Hwy. 61 at milepost 82.8 (Cook Co. Rd. 2, Sawbill Trail Rd.) Go 2.7 miles north on Sawbill Trail. This road is curvy and has a lot of blind spots. There is not much parking available, so please be courteous to others.
Responsibilities:
Work the aid station see Aid Stations 101!
Parking / Traffic Control:
The United States Forest Service asks that the Sawbill Trailhead parking lot be used for non-race-related parking only.
The Oberg aid station captain understands how parking and traffic control is supposed to happen. Specific parking and traffic control leaders will also be assigned. These “leads” will work with the aid station captain to rotate aid station volunteers in and out of the parking and traffic control position throughout the day so nobody has to do it all day (unless there is someone who prefers to work this position).
Volunteers helping with parking and traffic control should politely communicate with those entering the parking area to determine if they are “with the race” (i.e. spectators, volunteers, crew etc.) if so, those folks should park on the road – all other trail users should be allowed into the lot to park. THIS guide illustrates exactly how / where parking is permitted https://www.superiorspringtrailrace.com/wp-content/uploads/Superior-Spring-Trail-Race-Spectator-Guide-v1.pdf
For those volunteers working the road crossing, generally the best practice is to stop runners, not cars.
Ham Radio volunteers and aid station captains may have their vehicles in the parking lot if desired, additionally, race supply / resupply should be allowed into the lot along with folks from our medical staff and the Race Director.
Questions about any of this? Please ask! This is a very critical task and it is critical that we interface well with the public / those not associated with our race! Thank you!
Related Information:
Maps and Directions
Aid station Supplies Provided
Aid Stations 101
Aid Station - Oberg
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#oberg
Important: Note that the aid station open and close times listed below are projections based on current course record times – you should plan to arrive well before the earliest projected arrival time of the first runner to allow ample time to setup your aid station and be ready for the first runner.
Day: Saturday
Open: 7:15 AM Saturday (First expected runner approximately 7:50 AM – Arrive early for time to setup)
Close: 2:00 PM Saturday (last runner expected around 1:30PM – add time for cleanup and teardown)
Cutoff: 1:30PM Saturday
Report To: Oberg Mountain Aid Station / Aid Station Captain – Sam Olson
Description:
The Oberg Mountain aid station is located at mile 7.6 of the 25 KM, where it also serves as the turnaround point for that race. 50 KM runners likewise reach the Oberg Mountain aid station at mile 7.6, and revisit it at mile 23.4 on their return trip. First expected 50K runner in to this aid station around 7:50 AM. The Oberg Aid Station Cutoff is 1:30 PM (17:00 minute miles or 3.5 MPG average for 50K runners)
Driving Directions:
Turn off of Hwy. 61 at mile post 87.5 (Forest Rd. 336 or Onion River Rd.) Go north approximately 2.2 miles to parking area on left side of road.
Responsibilities:
Work the aid station see Aid Stations 101!
Parking and Traffic Control:
The United States Forest Service asks that the Oberg Trailhead parking lot be used for non-race-related parking only.
The Oberg aid station captain understands how parking and traffic control is supposed to happen. Specific parking and traffic control leaders will also be assigned. These “leads” will work with the aid station captain to rotate aid station volunteers in and out of the parking and traffic control position throughout the day so nobody has to do it all day (unless there is someone who prefers to work this position).
Volunteers helping with parking and traffic control should politely communicate with those entering the parking area to determine if they are “with the race” (i.e. spectators, volunteers, crew etc.) if so, those folks should park on the road – all other trail users should be allowed into the lot to park. THIS guide illustrates exactly how / where parking is permitted https://www.superiorspringtrailrace.com/wp-content/uploads/Superior-Spring-Trail-Race-Spectator-Guide-v1.pdf
Ham Radio volunteers and aid station captains may have their vehicles in the parking lot if desired, additionally, race supply / resupply should be allowed into the lot along with folks from our medical staff and the Race Director.
Questions about any of this? Please ask! This is a very critical task and it is critical that we interface well with the public / those not associated with our race! Thank you!
Related Information:
Maps and Directions
Aid station Supplies Provided
Aid Stations 101
Course Monitor 12.5K
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#course-monitor-12-5k
Description / Narrative / Protocol:
The Superior Spring Trail Race 12.5K (7.75MI) is a point to point race from Cathedral of the Pines Camp on Cook County Road 4 / Caribou Trail to Caribou Highland Lodge on Lutsen Mountain, see the race map HERE https://www.superiorspringtrailrace.com/wp-content/uploads/Superior-Spring-Trail-Race-Course-Map-1-5-22.jpg – It is a shorter distance race that compliments the 25K and 50K races (held on different sections of trail on the same day), that sometimes gets newer / less experienced trail runners. We do however caution runners that this is not a ‘beginner race course’.
Due to the remoteness of the course, there is no aid station for this race distance. In the absence of an aid station, we have a ‘monitor point’ established at the Superior Hiking Trail and Lutsen Access Snowmobile Trail intersection HERE https://goo.gl/maps/bfJD8AeQe8ojN6zj8?coh=178572&entry=tt (between the East and West Superior Hiking Trail Poplar River Camps), a detailed map / diagram can be found HERE https://www.superiorspringtrailrace.com/wp-content/uploads/SHT-Lutsen-Access-Intersection-Revised-May-13-2025.jpg This location is 5 miles into the 12.5K race course and 2.75 miles from the race finish at Lutsen (and only 2 miles to the Lutsen SHT Trailhead). Ideally we will have at least 4 volunteers at this location including a HAM radio volunteer, medical volunteer and a volunteer with an ATV. Generally we need fit individuals, with good trail knowledge, that can get to a runner in distress, quickly on foot.
We expect the first runner at this location by 9:35AM (9AM race start, 5 miles in, 7 minutes per mile) on Saturday, so monitors should be in position by 9:15AM at the latest. Two volunteer groups will go out and meet at the location. One group will go out on foot from Lutsen, they should meet by 7:45AM on the race finish line at Caribou Highlands and should be heading out by 8:00AM (you may coordinate another meet location among yourselves – you may also drive to and park at the trailhead HERE https://goo.gl/maps/ZeXwUtPGdSK1Jy4q7?coh=178572&entry=tt to cut off .75 miles if you like, if there is room). If available, another group will go out on ATV via the Lutsen Access Snowmobile Trail, accessed from Cook County Road 4 / Caribou Trail. This group can go directly there and should probably be unloading their machine at the access point for the Lutsen Access trail by 8:30AM at the latest.
Monitors should cheer on runners (haul out a big bag of candy if you want, I’ll reimburse), field any reports of runners in distress, locate runner in distress and if it is an emergency, communicate with NET Control. It is important to note that this is NOT a bailout point for runners who are just not having fun, since getting someone out via the Lutsen Access Snowmobile Trail would be no small feat. A runner should only be extracted if they physically cannot get themselves to the finish on the Superior Hiking Trail. In the event of an emergency, Lutsen EMS / search and rescue will be paged since they have the most local / on the ground knowledge of this area.
Carlton Peak Course Marshals
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#carlton-peak-course-marshals
Description / Narrative / Protocol:
The summit of Carlton Peak is the half-way point in the 50KM race. The first 50K runners will likely get up there no faster than 1:45 elapsed, the 50K starts at 7:00AM so if you were up there by 8:30ish you would be good – bottom line, before the first runners show up! The goals are as follows…
a.) Make sure people take the Carlton Peak Summit Spur (not continue on the trail to Temperance!) i.e. point people up to the peak and then back down to Sawbill. This IS marked but we have had people blow by the markings in the past since it is a hairpin turn.
b.) Make sure folks are finding their way to the Summit – then hype them up, etc. / be there to greet them. Feel free to add your own simple touches (see the photos linked below), we are happy to reimburse for any little touches you want to provide (remember though, this is not a full blown aid station by any means!)
c.) Be there to make a cell phone call to HAM Radio Net Control in the event of an emergency (we will provide a cell phone number the week of the race)
d.) Once the sweeps arrive, give it a few minutes, then you can take off!
Getting There:
Volunteers may hike up to Carlton Peak from the Sawbill / Britton Peak Trail HERE https://goo.gl/maps/VYbZPSyAj8eyVgrP9?coh=178572&entry=tt – it is an approximate 1.8 mile hike, OR if you have a high-clearance 4WD vehicle, you may drive to the old 3M mine site below Carlton Peak / Ted Tofte Overlook HERE https://goo.gl/maps/AVo1u7JYag4NnaxaA?coh=178572&entry=tt and hike approximately 1/3rd mile up to Carlton Peak.
Race course map for reference HERE https://www.superiorspringtrailrace.com/wp-content/uploads/Superior-Spring-Trail-Race-Course-Map-1-5-22.jpg
Have Fun With It!
Feel free to bring a bag of candy, or other fun accoutrements. See some past photos below…
Course Marking
Day: The Friday before the race Start: 7:15 AM Finish: Approx. 5:00 PM
Report To:
Race Director and Course Marking Leads (Paul Hasse 25K / 50K and Matt McCarty 12.5K) at Caribou Highlands Volunteer Townhome Unit 503 @ 7:15AM on Friday for a 7:45AM(ish) departure. We will have some social time and a briefing before we depart for marking.
Description / Responsibilities:
Mark the race course according to our marking protocol. Volunteers need to be very fit, able to carry some weight and travel a long distance on foot. Carry a daypack and be prepared for all weather conditions. Pack food and water and plan to be out all day. Work gloves are recommended when handing the marking flags due to the possibility of fiberglass splinters. Leads will have a ‘hammer and a spike’ or hammer drill for hard to install markers. You will be hiking, not running. Having a loppers and small handsaw on the crew is a good idea to clear any last minute branches or brush that could poke someone in the eye, etc. If you see anything on the trail that you are concerned about, please take a photo and not the location (geotagged photo or GPS point is great). Return unused marking paraphernalia to Caribou Highlands Townhome Unit 504.
Marking Methodology:
https://www.superiorspringtrailrace.com/wp-content/uploads/Trail-Marking-Protocol-Methodology-Revised-8-30-22.jpg
Marking Flags:
25K / 50K approx 400 flags + arrows.
12.5K approx 200 flags + arrows.
Course Map:
https://www.superiorspringtrailrace.com/maps-and-data/
IMPORTANT NOTE:
This volunteer position is for those that are looking to make a long term volunteer commitment, i.e. marking (and sweeping) trails for several years. While it is one of the most fun jobs there is, it is also one with the steepest learning curve and its execution is critical to the success of the event. Please email us if you have interest in learning our trail marking system and would like to become a trail marker for us!
Course Sweeping
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#course-sweeping
Day: Saturday Start: Saturday TBD Finish: 25K / 50K Saturday 4:00 PM | 12.5K Saturday 1:30PM
Report To: Caribou Highlands – Paul Hasse 25K/50K and Steve Hennessey 12.5K
Description: Course Sweeping
Responsibilities: Sweeping team follows the last runner picking up flags, looking for runners in distress, picking up garbage and enforce cutoffs. Course sweepers should be very fit and able to cover 25KM without issue. Sweepers will be hiking, not running. Plan to be out all day and dress accordingly. Bring plenty of food and water. Carrying a first aid kit is advised. Some sweepers are HAM Radio licensed and will be in touch with our HAM Radio communications team.
Cutoffs:
50K runners have 9 hours to complete the race and 25K runners have 8 hours to complete the race (by 4:00PM). Any runners not out of the the aid stations below by the times listed will be pulled from the course. All cutoffs will be strictly enforced – we do however reserve the right to pull (or allow to continue) any racer as we see fit.
• Sawbill Aid Station, outbound, mile 13.3, 11:15AM ( prior to 2025 the Sawbill cutoff was, inbound, at mile 17.7 at 12:00PM – if you would like to learn more about this change you can do so HERE https://www.superiorspringtrailrace.com/sawbill-aid-station-50k-cutoff-revision-effective-2025/ )
• Oberg Aid Station, inbound, mile 23.3, 1:30PM
There are no intermediate cutoffs in the 12.5K
Related Information:
https://www.superiorspringtrailrace.com/maps-and-data/
IMPORTANT NOTE:
This volunteer position is for those that are looking to make a long term volunteer commitment, i.e. sweeping (and marking) trails for several years and while it is one of the funnest jobs it is also one with the steepest learning curve and its execution is imperative to the success of the event. Please email us if you have interest in learning our trail marking system and would like to become a trail marker / sweeper for us!
Finish Area
Day: Saturday Start: 9:00 AM Finish: 5:00 PM
Report To: Cheri Storkamp or other designated lead at race finish line at Caribou Highlands
Description: Work finish area (as opposed to the finish line itself)
Responsibilities: Assist runners, answer questions, liaison between runners and medical volunteers, keep food and drink replenished, assist with merchandise sales, interface and assist finish line and timing volunteers as needed, clean-up and tear-down.
Related Information: NA
Finish Line
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#finish-line
Day: Saturday Start: 9:00 AM Finish: 5:00 PM
Report To: Designated lead at finish line at Caribou Highlands
First Finishers: The first 25KM and 12.5KM runners are expected around 9:45AM, the first 50K finishers are expected around 10:50AM
Description / Responsibilities:
Work finish line of the Superior Spring Trail Race 50K, 25K, 12.5K
• Hand all runners a finishers medal (it is the same medals for each distance). Award with the large letter S facing out.
• Assist runners once they cross the finish line, helping wobbly runners off of their feet (make sure there are some chairs available nearby), offer water, soda or snacks / food as needed.
• Keep an eye out for runners under duress – interface with medical staff (North Shore Ambulance out of Cook County will be at the race) and medial volunteers if needed (and understand in advance who those medical folks and where you can find them).
• Be available to answer runner questions.
• Interface with the timers, offering them assistance if they need any.
• Cheer and keep the vibe high! If ringing cowbells, do so judiciously / as to not drive each other insane!
Please Take Breaks:
We have to staff the finish line from 9:00AM until 4:00-5:00PM (until the last runner). A risk is that volunteers do not take breaks early or often enough, and are fried by the end of the day. Coordinate taking breaks with your fellow volunteers so we all have the energy to keep going in the final hours of the race!
Related Information:
https://www.superiorspringtrailrace.com/wp-content/uploads/superior-spring-trail-race-finish-area-diagram-rev-4-30-22.jpg
Final Cleanup - Saturday Night
Report To:
Race Director @ Finish Line / Caribou Highlands Patio / Pool Area
Description:
Final Clean-Up, Tear Down and Haul-Out
Responsibilities:
Help us hit it home! Everyone is tired at the end of a long race day but we need to make one final push until every last piece of equipment is in the trailer and the area is cleaned up – if you can stay and help – that is just huge!
Related Information: NA
Floater
Report To: Race Director
Description: Shadow / Assist Race Director
Responsibilities: Stay with race director to act as right-hand
Related Information: NA
Friday Packet Pickup
Day: Friday
Start: 3:45 PM
Finish: 8:15 PM
Packet pickup lasts from 4:00 PM to 7:00 PM.
Report To:
Cheri Storkamp or other assigned ‘lead’ at party tent adjacent to race finish line at Caribou Highlands.
Description / Responsibilities:
Arrive early to help setup packet pickup. Help with packet pickup for the 12.5KM, 25KM and 50KM races – getting runners their numbers, shirts, etc., answering questions etc. Help with tearing down and picking up packet pickup.
Related Information:
https://www.superiorspringtrailrace.com/wp-content/uploads/superior-spring-trail-race-finish-area-diagram-rev-4-30-22.jpg
Friday Setup
Day: Friday Start: Approx 10:00 AM Finish: Approx 1:00 PM
Report To: Race Director or Cheri Storkamp at Race Finish at Caribou Highlands
Description: Help get setup!
Responsibilities: Help setup packet pickup and the race finish.
Related Information:
https://www.superiorspringtrailrace.com/wp-content/uploads/superior-spring-trail-race-finish-area-diagram-rev-4-30-22.jpg
HAM Radio - Communications
Day: Saturday Start: Saturday 6:00 AM Finish: Saturday 4:00 PM
Report To: Ham Radio Coordinators Rick and Jayne Johnson
Description: Provide communications for race – a team will be stationed at each aid station. Assignments / times will be provided and emailed to HAM Radio team by HAM Radio Coordinator. https://bwarc.wordpress.com/
Responsibilities: Communications
Related Information: NA
Logistics (Equipment / Supply)
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#logistics
Day: Saturday Start: 5:45AM Finish: 5:30PM
Report To:
Caribou Highlands – Logistics Lead, Scott Radke
Description & Responsibilities:
Most of the supplies will be loaded and distributed out of a large sprinter van driven by the logistics lead. If space in the Sprinter is an issue, some water or supplies may get broken out and loaded into another logistics volunteers truck / SUV. Distribute supplies to each aid station and pick up supplies when aid stations close. Bring additional supplies out to aid stations and refill water as needed throughout the day. Set up two road signs (caution race in progress) on Sawbill Trail and one on Onion River Road.
VERY IMPORTANT: Always check in with HAM Radio when you arrive at a new location; Finish, Oberg or Sawbill. They may have instructions for you. Stay in touch with your fellow logistics volunteers throughout the day via text and call.
VERY IMPORTANT / THE CRUX – Timing and Coordination:
Meet at Caribou Highlands at 5:45AM and do any final loading of water and supplies. Depart Caribou Highlands by 6:20AM at the latest. It is a 15 minute drive to the Oberg Aid Station. Arrive at Oberg Aid Station by 6:45AM and drop supplies for aid station captain Sam Olson. It takes about 15+ minutes to unload. The first runners is expected in at Oberg at 7:55AM. Depart for Sawbill by 7:00AM, it is a 15 minute drive. Arrive at Sawbill Aid Station at 7:15AM and drop supplies for the aid station captain Dale Immerfall. The first runner is expected in at Sawbill at 8:35AM.
Water:
There is likely enough water being dropped off at each aid station to make the entire day. That said, it needs to be monitored, and as good as the aid station captains are, they get busy and may not be monitoring super closely. You can do the following. Get a count from the HAMS of how many runners are yet to come through an aid station. Then get a count of remaining / full (7 gallon) water jugs. You can then run some quick ‘race math’ scenarios – example; 130 runners yet to come through, each will take 20 ounces of water. 130 X 20 = 2600oz / 128oz per gallon = 20 gallons / 7 gallons per water jugs = 3 water jugs needed.
Food / Resupply:
There will be some extra food and snacks in the race trailer. There will be a few extra camp stoves as well. If an aid station runs out of something that we do not have in the trailer, it can be procured from Tofte General Store or Holiday Gas Station. Scott can purchase with his card, Cheri can provide cash, or if time is an issue, other logistics volunteers can charge it and we will reimburse (please save your receipts).
** This document is a work in progress and I am open to suggestion on how to refine it / inprove its accuracy. Thank you.
Related Information:
https://www.superiorspringtrailrace.com/maps-and-data/
Medical Support - Finish Line
Day: Saturday Start: 6:00 AM Finish: 5:00 PM
Report To: Caribou Highlands / Race Director
Description: Medial personnel to staff finish line and be on-call for medial incidents at finish line or ready to be dispatched elsewhere on the course if required.
Responsibilities: Provide medical support, advice and triage for the Superior Spring Trail Race. Assist in making determinations weather additional medical personnel or emergency services need to be called in.
Related Information:
For Emergencies Dial 911
Cook County North Shore Hospital and Care Center
515 5th Ave West
Grand Marais MN 55604
218-387-3040
Cook County Sheriffs Office
Cook County Law Enforcement Center
143 Gunflint Trl
Grand Marais, MN 55604
(218)387-3030
Medical Support - Roving
Day: Saturday Start: Saturday 6:00 AM Finish: Saturday 4:00 PM
Report To: Caribou Highlands / Race Director
Description: Medial personell to staff finish line and be on-call for medial incidents at finish line or ready to be dispatched elsewhere on the course if required.
Responsibilities: Provide medical support, advice and triage for the Superior Spring Trail Race. Assist in making determinations weather additional medical personnel or emergency services need to be called in.
Related Information:
For Emergencies Dial 911
Cook County North Shore Hospital and Care Center
515 5th Ave West
Grand Marais MN 55604
218-387-3040
Cook County Sheriffs Office
Cook County Law Enforcement Center
143 Gunflint Trl
Grand Marais, MN 55604
(218)387-3030
Parking
The direct link to this information is https://www.superiorspringtrailrace.com/volunteer-jobs/#parking
Narrative:
Participant, spectator and volunteer parking for the Superior Spring Trail Race start and finish, takes place across Ski Hill Road / directly to the east of Caribou Highlands lodge in Lutsen’s large gravel surface parking lot. While runners and spectators that are staying at Caribou Highlands Lodge will be parked on Caribou Highlands property (to the west of Ski Hill Road), those staying elsewhere / traveling up from Duluth on race morning, etc., will park in Lutsen’s lot on the east side of Ski Hill Road.
Parking volunteers will report to the ‘parking lead’ [ Edward Sandor in 2026 ] at 5:00AM on Saturday morning at the ‘all black race trailer’ adjacent to runner check-in, which is held behind Caribou Highlands under the large white party tent. Parking volunteers will be issued fluorescent yellow safety vests so they are visible / easily identifiable by motorists and will be issued radios (parking uses channel 1) so they can communicate with other parking volunteers. The parking ‘lead’ will be issued an orange fluorescent safety vest so they are easily identifiable to parking volunteers, and others. If you are running late, grab those items for yourself from the trailer and report to the large gravel surface parking lot on the other side of Ski Hill Road from Caribou Highlands, introduce yourself to the parking lead in person, or announce yourself over the radio. The parking task should be wrapped up by 9:00AM.
Parking is an extremely important volunteer position. We place an extremely high level of importance on this task. Parking is our first touchpoint with participants on race day, and we want it to be a good experience for them. It is important to note that as great as our trail running community is, people can be weird in the morning, when in their cars, and nervous with anticipation for their race – kill them with kindness! Importantly, if parking is not managed, people do not park efficiently, and we run out of parking. It is also very important to note that Lutsen Mountain owns the majority of the parking lot that we use for both the Spring and Fall race and graciously allows us to use it for both races – we need to manage parking well so they continue to allow us to use their parking lot for the races.
The parking lot is an irregular shape and parking spots are not delineated (painted / striped). The goal is to get cars parked in an orderly manner, making the best use of available space in the parking lot, while helping to ensure no cars or infrastructure are damaged. Common sense goes a long ways.
Please also see this diagram.
Photography
The direct link to this content is https://www.superiorspringtrailrace.com/volunteer-jobs/#photography
Photographers play a special role in documenting and memorializing the Superior Spring Trail Race for individual race participants and our running community as a whole. It is also a great service to us, the race organizer, having great photography in order to paint a picture of what our event is about for runners, volunteers, sponsors, partners, permitting agencies and the general public.
We are always looking for hobbyist and professional photographers who are willing to share their time, skills, and equipment shooting photos at Superior. While we welcome anyone that wants to come shoot (even with a phone), this is a great position for those with DSLR or mirrorless digital cameras, as capturing moving runners (often in the woods in low light) is no easy task, and a large sensor and fast shutter are needed in order to capture clear and crisp photos. It is not lost on us that this is a unique volunteer position in that it not only requires your time on race weekend, but requires the use of specialized personal gear, and time spent in the days after the race post-processing and delivering images to us.
Photographers are generally welcome to shoot whatever (and wherever) at Superior calls to them. We are fortunate in that we have typically have enough coverage in that we do not have to be overly prescriptive in asking individual photographers what and where to shoot. One exception to this is that we really like to have a dedicated finish line photographer in an attempt to capture a photo of each runner at the race finish. That said, if you would like help with planning or logistics or have any questions at all, we are here to help and so are your fellow photographers who have experience on the course.
Generally we are looking for photos that represent all aspects of our the event (not just runners running); check-in, pre-race, race starts, on trail, in aid stations, runners running, runners walking, runners doubled over, all race distances, front, middle and back of the pack, all shapes and sizes, and walks of life, volunteers, Superior / RSR swag, crew, pacers, dogs, kids, landscapes, wildlife, macros, aerials, struggles, triumphs, the race finish, day and night. You can get a great idea of the type of shots that we like in the very large curated photo gallery on the homepage of our website HERE https://www.superiorspringtrailrace.com/ . At the end of each race my goal is to have a broad enough range of photos to tell the entire story of that year’s Superior Trail race, both in a curated highlights photo gallery (example; https://www.superiorspringtrailrace.com/photos-2025-highlights/ ) from that year, and in a race recap (example; https://www.superiorspringtrailrace.com/2025-superior-spring-trail-race-recap/ )
Whenever possible it is great to get photos from you within five days of the race. I typically try to curate the photo highlights gallery, write and send out my race recap between 5 and 8 days after the race. If you get me your photos after this, that is just fine, participants know to check back and will still find them, but they will not be included in the original submission of the photo highlights gallery or race recap (sometimes I will try to go back and edit some in). I pride myself in going through each and every photo after the race and finding at least of a few of everyone’s to highlight.
Many of our photographers have somewhere that they host their own photos, and this is great / the easiest for us (Google Photos, Google Drive, Flickr, SmugMug, their own website, etc.). After you post-process, upload your photos, and send me a link – I post / link to your gallery HERE https://www.superiorspringtrailrace.com/photos/ – for those that do not have a place that they can or want to host photos, you are welcome to zip them up / send them via a filesharing service (I think WeTransfer works really well) and I will upload them to our Google Photos in its own gallery, and will credit you in the title of the gallery.
Please know that we respect, value and appreciate your work! We ask the following of all of our participants on the photo page: “If you are sharing or posting photos for personal use, it is always good form to credit the photographer. If you’d like to use an image for a commercial purpose (e.g. publish in a magazine, use to promote a product etc.), please contact photographers for permission and terms of use.” By shooting the race you are agreeing that we (Superior Spring Trail Race) may use your photos on our event website, social media, and in emails in perpetuity. That said, you retain full ownership of your photos. If a sponsor, large / for profit media entity, etc. asks for photos from the race we will put them in touch with you so you can negotiate your terms, if any. We do ask that if one of the non-profits that we work with, or small local media outlet would like to use one/some of your images, that you consider donating them.
If you are interested in coming and shooting for us please do. If you have any questions, please reach out.
Post Race Cleanup - Monday After (Twin Cities Area)
Monday is the day all the equipment comes back out of the trailer and gets cleaned, dried and put away, it is no small feat! If you would like to help you are more than welcome, please email for more details / directions on where to go. Takes place in the Twin Cities – 25 minutes south of St. Paul, MN.
Saturday Packet Pickup / Check-In
Day: Friday Start: 6:00 AM Finish: 9:30 AM
Report To: Cheri Storkamp or other assigned ‘lead’ at Caribou Highlands
Description: Help Check in runners and facilitate the start of the race.
Responsibilities: Unload equipment, make coffee, check in runners, clean-up, pack-up. Morning Packet pickup starts at 5:30 AM. 50KM starts at 7:00AM, 25KM starts at 8:00AM and 12.5K starts at 9:00AM
Related Information: NA